LocalFILE PHOTOOld Lyme / Local
Single-Track Phase Planned For Old Lyme Rail Bridge
Amtrak’s project page lists single-track operation from November 2026 through November 2027 during replacement of the Connecticut River crossing, without precise cutover dates.







