TOLLAND — A town panel will consider who should handle testing for the expansion of Fire Station 140 on Crystal Lake Road. The Firehouse Subcommittee meets online Tuesday, November 17, at 4:30 p.m.

The agenda lists quotes from Terracon and Materials Testing Inc. along with a statement of special inspections. The panel will also review masonry selection and lead times. The expansion calls for an addition and interior work to enlarge the bays where the department keeps its vehicles.

The same meeting includes a separate $5,374.93 change order at Station 340 for a trench drain outlet and a drain spout. The agenda includes a Zoom link and call-in instructions.